top of page
Search


New pedestrian and bicycle walkway in Sant Andreu de la Barca
From Av. Constitució to the Centrañ Park


Sanitation network in Castellbisbal
Project to improve the sanitation network in Castellbisbal


New collector in Santa Susanna
Project for a new collector to replace the existing one, between pumping station 3 in Santa Susanna and the pretreatment plant in Pineda...


Urbanization of the Castellet Partial Plan in Sant Quirze del Vallès
client: Junta UrbanÃstica de Compensació El Castellet i Inmoglaciar Management
location: Sant Quirze del Vallès


Demolition and urbanization of the Sala i Badrinas factory
client: Junta de Compensació del PM Urbana del Sector de la Fà brica Sala Badrinas · Terrassa City Council


Final project of the new footbridge in Sant Andreu de la Barca
We are very satisfied, once again, to be able to collaborate and build for our neighbors.


Improvements in the outdoor area of the Badia del Vallès Sports Complex
client: Area Metropolitana de Barcelona
Ajuntament Badia del Vallès
location: C. Tibidabo - Badia del Vallès


New footbridge for pedestrians and bicycles in Sant Andreu de la Barca
New footbridge for pedestrians and bicycles, from Avda. Constitución to the Central Park, Sant Andreu de la Barca


Renovation of the dn500 water transport pipeline in the Zona Franca, phases 3 and 4
client: AIGÃœES DE BARCELONA, S.A
location: Zona Franca - Barcelona


New DN400 pipeline and connections to existing pipes
client: AIGÃœES DE BARCELONA, S.A
ubicació: Cristòfol de Moura - Sant Adrià del Besòs


Renovation of the Palosca c100 impulsion pipeline, "La Estrella" well
client: AIGÃœES DE BARCELONA, S.A
location: Sant Feliu de Llobregat


Construction of a walkway to connect Anoia Street with the Central Park
client: AREA METROPOLITANA DE BARCELONA
location: Parc Central - Sant Andreu de la Barca


Committed to water
Archs Constructora has always been highly committed to the environmental aspects of the works it carries out.


Ajuntament Square development (stage III)
client: AJUNTAMENT DE SANT ANDREU DE LA BARCA
location: Sant Andreu de la Barca


Sant Andreu de la Barca: a guiding light for Archs Constructora
It is hard to talk about Archs Constructora without mentioning the town where it is based: Sant Andreu de la Barca


Upgrading the Pontarró area in the Can Carreras neighbourhood
client: AJUNTAMENT DE MARTORELL
location: Camà del Pontarró · Martorell


Increasing the capacity of the well catchment pipe in Cornellà and Sant Joan DespÃ
AIGÃœES DE BARCELONA
Sant Joan Despà - Cornellà de Llobregat, 2018


Redevelopment of the Pompeu Fabra square in Martorell
client: AJUNTAMENT DE MARTORELL
location: Plaça Pompeu Fabra - Martorell


Archs Constructora strengthens its position in the industrial and civil engineering sector
Archs Constructora is strengthening its position in this sector, gaining additional experience to take on more ambitious projects.


Redeveloping l’Orient, Sant Marc and Miquel Blanch streets and el Joc Square
client: ÀREA METROPOLITANA DE BARCELONA
location: Castellbisbal

News
bottom of page