Renovation of the Palosca c100 impulsion pipeline, "La Estrella" well


Water pipe renovation | Archs Constructora

management: Antonio Arroyo Campos (Engineer)

ending year: 2020 budget: 774.872 €


The objective of this renovation is to reduce the number of breaks that occur in these pipes and, therefore, the losses associated with the deterioration of pipes that have been operating for more than 60 years. In the same way, the projected action aims to increase the mechanical resistance of the installed pipes.

 