Project for a new collector to replace the existing one, between pumping station 3 in Santa Susanna and the pretreatment plant in Pineda de Mar.
A total of 1,300 m. of pipes that will be installed on the mountain side of the road. This represents a change to the current layout that will force us to make an underpass with directed drilling, a technique that allows the installation of services without the need to excavate.
Kommentare