Renovation of the dn500 water transport pipeline in the Zona Franca, phases 3 and 4


Installation of a new pipeline (Zona Franca)

management: Antoni Andreu Torras (Dr. Engineer)

ending year: 2021 length: 1.130 m budget: 2.326.000 €


Installation of a new DN500 water transport pipe on 6 St in the Zona Franca of Barcelona, replacing the current transport pipe, with a diameter of 500mm, made of reinforced concrete with sheet metal casing.

It includes the new sectioning equipment, air vents and discharges, as well as hydrants and connections to the distribution network. Also the chests and solid concrete.

 